Yadkin Regional Water Supply Project – Raw Water Infrastructure Intake
Huxted Trenchless installed 300 LF of 54 inch welded steel pipe via microtunnel for a new water intake structure. The project was performed in mixed ground of partially weathered rock and clay and included an underwater retrieval of the MTBM within Lake Tillery.