San Juan Lateral Project
Horizontal Directional Drilling
Huxted Trenchless completed three separate HDD installations on the San Juan Lateral for the U.S. Department of the Interior’s Navajo-Gallup Water Supply Project in San Juan County, New Mexico.
The work consisted of two 42-inch steel water supply lines (1,828 LF and 1,606 LF) and one 48-inch steel water supply line (1,962 LF), drilled through a mixed formation of silty sands, clay, sandstone, siltstone, mudstone and shale.