James River Crossing

Horizontal Directional Drilling

James River Crossing

Location: Newport News, Virginia
Status: Completed 2024
Method: Intersect HDD
Product Pipe: 42" DR 11 HDPE
Length: 5,700 LF
Final Ream: 54"
Crossing: James River
Owner: Hampton Roads Sanitation District (HRSD)
1434 Air Rail Ave
Virginia Beach, VA 23455
(757) 460-2261
Engineer: Dewberry
8401 Arlington Blvd
Fairfax, VA 22031
(703) 849-0217
General Contractor: Garney Construction
277 Bendix Road, Suite 430
Virginia Beach, VA 23452
(321) 624-5478
Key Personnel: Greg Horn, Lead Engineer
Oscar Myers, General Superintendent
Benny Burton, Superintendent
John Langford, Operations Manager

Huxted Trenchless performed the intersect HDD installation of approximately 5,700 LF of 42-inch DR 11 HDPE to serve as a new HRSD force main beneath the James River. Huxted’s scope included drilling and intersecting the pilot bores, reaming the completed bore to approximately 54 inches, and the final pullback and installation of the 42-inch product pipe.

The project presented significant engineering and construction challenges, including the transition from the originally proposed water-to-water HDD configuration to a more complex land-to-land intersect drill. Supporting work included approximately 300 LF of 66-inch casing installed within a cofferdam and approximately 600 LF of casing supported on temporary “goal posts” outside the main river channel.