HEEC 115KV XLPE Submarine Cable Project
Project Description:
a. Drilling footage: Two (2) Crossings 4300ft (One on Conley Terminal and one on Deer Island)
b. Formation: Jettable Materials & 15,000 PSI Rock Shore Approach
c. Product Pipe: 24” HDPE
Project Description:
a. Drilling footage: Two (2) Crossings 4300ft (One on Conley Terminal and one on Deer Island)
b. Formation: Jettable Materials & 15,000 PSI Rock Shore Approach
c. Product Pipe: 24” HDPE