Dog River Reservoir Expansion

Microtunneling

Dog River Reservoir Expansion

Location: Douglas County, Georgia
Status: Completed 2026
Method: Microtunneling
Diameter: 51"
Drives: Three
Lengths: 144, 110 & 96 LF
MTBM Recovery: In-Reservoir
Owner: Douglasville-Douglas County Water and Sewer Authority
8763 Hospital Drive
Douglasville, GA
(770) 949-7617
Engineer: R.J. Wood and Company
712 Mill Walk
Atlanta, GA 30327
(478) 956-9978
General Contractor: Clark Water – Reeves Young Joint Venture
7900 Westpark Drive
McLean, VA 22102
(571) 350-3500
Key Personnel: Harsha Reddy, Project Manager
Benjamin Burton, Field Operations Manager
Nicholas Cashdollar, Superintendent
Patrick Miller, Project Engineer

Huxted Trenchless installed three 51-inch diameter microtunnels with lengths of 144 LF, 110 LF and 96 LF. All three drives were launched from a common jacking shaft at varying elevations, and each required retrieval of the microtunnel boring machine (MTBM) from within the reservoir.

The work demanded precise alignment control and close coordination to accommodate the multiple tunnel elevations and to complete each MTBM retrieval successfully.