North Clarksville Water Treatment Plant
Microtunneling
Huxted Trenchless installed approximately 480 LF of 87.5-inch Permalok steel casing by microtunneling in a single drive for the North Clarksville Water Treatment Plant.
The entire alignment was excavated through full-face hard rock.