Piedmont Natural Gas Line 427
Project Description:
a. Drilling footage: Five (5) Crossings totaling up to 9,328 ft.
b. Formation: Sands, Silts, Clays and Weathered Rock
c. Product Pipe: 16-inch Steel pipe.
Project Description:
a. Drilling footage: Five (5) Crossings totaling up to 9,328 ft.
b. Formation: Sands, Silts, Clays and Weathered Rock
c. Product Pipe: 16-inch Steel pipe.